0

Loading Througth Top Outlet

Loading througth Top Outlet
Step 1.
Refer to section on Loading Procedures
Step 2. Check that all bottom valves are closed.
Step 3. Remove top outlet blank flange. Both hose coupling to top outlet flange.
Step 4. Connect vapour return line and open valve to vent tank.
Step 5. Load tank to required level. Check constantly for leaks in hoses and connections.
Step 6. Drain hose, close top outlet valve and remove hose from tank. Replace top outlet blank flange.
Step 7. Close airline valve, disconnect vapour return line and replace blanking cap.
Step 8. Refer to Section After Loading